Internal and external temporary hoarding systems designed for safe and secure installation

Plasloc understands the importance of versatility in temporary screening installations and its ability to conform to every scenario in all situations. Whether you need to create a temporary partition for a short-term project in a retail environment or install screening on a construction site for a longer-term solution, temporary screening can provide an effective and flexible solution to a wide range of challenges.

We utilise our unique patented panel to provide a fully adaptable temporary hoarding system which can be integrated into internal screening or external partitioning, ideal in any urban environment.

Temporary screening benefits from Plasloc

Plasloc’s internal and external temporary screening solutions have a number of benefits:

  • Flexible and Versatile – Describes Plasloc’s proven ability to be fully adaptable in configuration options and can be placed in any environment. Our temporary screening solution can be tailored to any specific requirements you may have, from managing the flow of people to screening construction work as a temporary dust screen.
  • Safe and secure – The fundamental requirement of any good temporary screening is to provide a high level of protection in any scenario in an effective way. Plasloc is an ideal solution and has an established proven record of providing a safe and reliable solution for use in busy environments while building work takes place.
  • Durable and reusable – Plasloc’s temporary screening can be reused time and time again, making it a cost-effective solution for a wide range of different applications. It is also easy to clean and maintain, ensuring that it remains in good condition throughout its lifespan.
  • 100% Recyclable – As a screening material Plasloc is 100% recyclable ensuring a neutral carbon footprint and positive green credentials, providing a sustainable win for like-minded businesses.

The best temporary screening from Plasloc

Our temporary screening is made from high-quality materials that are designed to be durable and long-lasting. Our freestanding modular internal hoarding is available at 1.2m or 2.4m in height but can be adapted up to 3m and is structurally tested and certified to meet BS 6180:2011 for additional stability.
Our external hoarding is best where construction work is being carried out or if a project requires the public to be directed away from a particular area safely using a temporary screen. Both our internal and external temporary screening is ideal for graphics and advertising. Have a look at our optional extras page for further details.

Plasloc banners at Thorpe Park.

Frequently Asked Questions

Got a question for us? Hopefully we can answer it in our Frequently Asked Questions here:

Get a quote

Is site hoarding a legal requirement?

To comply with the Health and Safety at Work Act 1974, all employers and the self-employed must take reasonable steps to ensure the safety of the general public. The implication of this is that construction sites need a protective boundary, with site hoarding being the most fitting solution. This has led to a demand for hoarding construction systems .

Who is responsible for construction hoarding?

The principal contractor has responsibility for construction site hoarding. However, whether they wish to design the hoarding construction themselves or employ a subcontractor to do it for them is their choice.

When do construction hoardings need to be in place?

Before any construction work starts. In most cases within the construction industry, this is essential to protect site workers and comply with the Health and Safety at Work Act 1974, Construction (Design & Management) Regulations 2015 and other relevant guidance.

How long should hoardings last?

Hoarding construction needs to last for as long as the construction is taking place on a particular site. However, whilst the length of time will depend on the individual project circumstances, the standard acceptable lifespan of site hoarding is 10 years.

How much will my project cost?

The cost of a project will depend on the type of hoarding you require and the duration of your project. All Plasloc products are competitively priced, and we work closely with you to provide the best quotation and price for your hoarding construction requirements. Get in touch today for a free quote with no obligations.

How does Plasloc fit together?

All sections of Plasloc hoarding are connected with a traditional tongue and groove joint and compression lock which removes the need for any fixings such as nails and screws and reduces any cutting and drilling to limit potential damage. It also requires no ground penetration, so it can easily be installed at the start of the project and removed at the end of it, to suit all your hoarding construction needs.

Success Stories

Plasloc has successfully completed numerous high-profile, ambitious projects due to the consistent strength of our products' ability to adapt and the professional team of operatives to implement effective delivery.

Internal hoarding with advertising
External hoarding with Sainsbury's advertising
Internal hoarding
Internal hoarding
Glasgow Fort
Carphone Warehouse
Internal hoarding inside a John Lewis store
Ikea

Just to let you know that in Morrisons Monthly Contractors Meeting (all their main contractors) it was noted by Morrisons how impressed they was with the quality of the Plasloc external hoarding and indicated that that’s what they would like to see on all their projects that required solid external hoarding.

Terry Heath // Project Manager ISG PLC

Yesterday I was having a walk round with the architects and the client and they all commented on how good the hoarding looked. To the point the client wanted to know why after 10 years of us working at Redbull why we have not used this system before.

Simon Whittaker // Site Manager SDC Special projects

A nice email to start the day… I would like to pass on my thanks to your two operatives on site last night at Water Lane. If everyone was that efficient, tidy and helpful it would make the world of construction a lot easier.

Ryan Wilks // Site Manager RG Group

Plasloc is a great example of an innovative company, addressing and utilising the sustainability agenda as a business opportunity. By developing high quality carbon friendly products, they have capitalised on new market opportunities and increased their competitiveness.

Paul Gilbert // Manufacturing Specialist SWMA

Thanks for a job well done. I have been impressed with the product and would definitely use you guys again should the opportunity arise.

Matt Davis // Balfour Beatty Project Manager

The install team was always polite and well presented, the work was carried out with the minimal interruption to the hospital and on completion the area was left clean and tidy. The product is very well suited to the clinical needs of a hospital environment

Ian West // Project Manager West Hertfordshire Hospital Trust

News & Advice

See all news
Get in touch

Get a quote today

Do you require the best hoarding solution for your hoarding construction project? We’re here to help support you from start to finish, whether it is large or small, we will find the best hoarding construction solution for you.

Get a quote
PNG image of CPA logo PNG image of Constrctiononline logo PNG image of CHAS logo