A safe screening solution that allows no education to be lost

The Plasloc hoarding and screening systems have been designed to not just cause minimal disruption when installed but also once construction work is undertaken – from start to finish. From tunnels for pupils to pass through whilst work goes on in the surrounding areas to hygienic temporary internal screening for safety, our hoarding solutions mean staff and pupils can continue with their day uninterrupted. The Plasloc partitioning system needs no mechanical fixings into the floor and provides a clean and light environment to keep staff and pupils comfortable in their surroundings. An acoustic rated system is available to limit noise.

Safe and secure installation with minimal disruption

All Plasloc systems are made from robust 100% recycled post consumer & post industrial uPVC plastic.

Acoustic and fire rated system available

Business as usual with minimum disruption whilst construction and refurbishment work is undertaken

Frequently Asked Questions

Got a question for us? Hopefully we can answer it in our Frequently Asked Questions here:

Get a quote

Is site hoarding a legal requirement?

To comply with the Health and Safety at Work Act 1974, all employers and the self-employed must take reasonable steps to ensure the safety of the general public. The implication of this is that construction sites need a protective boundary, with site hoarding being the most fitting solution. This has led to a demand for hoarding construction systems .

Who is responsible for construction hoarding?

The principal contractor has responsibility for construction site hoarding. However, whether they wish to design the hoarding construction themselves or employ a subcontractor to do it for them is their choice.

When do construction hoardings need to be in place?

Before any construction work starts. In most cases within the construction industry, this is essential to protect site workers and comply with the Health and Safety at Work Act 1974, Construction (Design & Management) Regulations 2015 and other relevant guidance.

How long should hoardings last?

Hoarding construction needs to last for as long as the construction is taking place on a particular site. However, whilst the length of time will depend on the individual project circumstances, the standard acceptable lifespan of site hoarding is 10 years.

How much will my project cost?

The cost of a project will depend on the type of hoarding you require and the duration of your project. All Plasloc products are competitively priced, and we work closely with you to provide the best quotation and price for your hoarding construction requirements. Get in touch today for a free quote with no obligations.

How does Plasloc fit together?

All sections of Plasloc hoarding are connected with a traditional tongue and groove joint and compression lock which removes the need for any fixings such as nails and screws and reduces any cutting and drilling to limit potential damage. It also requires no ground penetration, so it can easily be installed at the start of the project and removed at the end of it, to suit all your hoarding construction needs.

Success Stories

Plasloc has successfully completed numerous high-profile, ambitious projects due to the consistent strength of our products' ability to adapt and the professional team of operatives to implement effective delivery.

Internal hoarding with advertising
External hoarding with Sainsbury's advertising
Internal hoarding
Internal hoarding
Glasgow Fort
Carphone Warehouse
Internal hoarding inside a John Lewis store
Ikea

Just to let you know that in Morrisons Monthly Contractors Meeting (all their main contractors) it was noted by Morrisons how impressed they was with the quality of the Plasloc external hoarding and indicated that that’s what they would like to see on all their projects that required solid external hoarding.

Terry Heath // Project Manager ISG PLC

Yesterday I was having a walk round with the architects and the client and they all commented on how good the hoarding looked. To the point the client wanted to know why after 10 years of us working at Redbull why we have not used this system before.

Simon Whittaker // Site Manager SDC Special projects

A nice email to start the day… I would like to pass on my thanks to your two operatives on site last night at Water Lane. If everyone was that efficient, tidy and helpful it would make the world of construction a lot easier.

Ryan Wilks // Site Manager RG Group

Plasloc is a great example of an innovative company, addressing and utilising the sustainability agenda as a business opportunity. By developing high quality carbon friendly products, they have capitalised on new market opportunities and increased their competitiveness.

Paul Gilbert // Manufacturing Specialist SWMA

Thanks for a job well done. I have been impressed with the product and would definitely use you guys again should the opportunity arise.

Matt Davis // Balfour Beatty Project Manager

The install team was always polite and well presented, the work was carried out with the minimal interruption to the hospital and on completion the area was left clean and tidy. The product is very well suited to the clinical needs of a hospital environment

Ian West // Project Manager West Hertfordshire Hospital Trust

News & Advice

See all news
Get in touch

Get a quote today

Do you require the best hoarding solution for your hoarding construction project? We’re here to help support you from start to finish, whether it is large or small, we will find the best hoarding construction solution for you.

Get a quote
PNG image of CPA logo PNG image of Constrctiononline logo PNG image of CHAS logo