Our office will be closed on 20th Dec- 6th Jan 2025. We wish all our customers a Merry Christmas and a Happy New Year
Plasloc’s External Hoarding system is non-ground penetrating which means the hoarding construction makes no impact on land or buildings in and around the site perimeter. The building site hoarding is temporary fencing that is freestanding and self-supporting, so it is ideal for urban environments. The system is a popular choice, configured by using a combination of a weighted scaffold structure and clad with the Plasloc boards. This gives the system enormous versatility in design and ensures maximum stability. As perimeter fences, Plasloc’s External Hoarding system makes an excellent choice as solid structures that give your project site security, preventing unauthorised access and potential theft, vandalism and arson by minimising access points to the site for pedestrians. The beauty of the system is that it can be configured by our experienced knowledgeable operatives in an efficient safe manner guaranteeing minimal disruption. Our external system can be purchased for those very long-term projects but is usually hired giving you additional flexibility especially if your works are phased and the hoarding construction location requires shifting around the building site as areas are opened up to the public. A further advantage is at the end of the project we return to the site and deconfigure the hired product for you and take it away leaving no trace the hoarding construction system was ever there, so you are not left with costly repairs and making good expenses.
UPVC planks manufactured in the UK, made from recycled materials
Clean, fresh and hygienic in look, strong and durable
Can be left white or corporate colours / graphics applied
No ground penetration, (no costly repairs) weighted system scaffold
Safe / Easy manual handling, lightweight materials
Zero waste
Closed loop recycling
Bespoke design, with structural calculations
Reusable
System design
Got a question for us? Hopefully we can answer it in our Frequently Asked Questions here:
Get a quoteTo comply with the Health and Safety at Work Act 1974, all employers and the self-employed must take reasonable steps to ensure the safety of the general public. The implication of this is that construction sites need a protective boundary, with site hoarding being the most fitting solution. This has led to a demand for hoarding construction systems .
The principal contractor has responsibility for construction site hoarding. However, whether they wish to design the hoarding construction themselves or employ a subcontractor to do it for them is their choice.
Before any construction work starts. In most cases within the construction industry, this is essential to protect site workers and comply with the Health and Safety at Work Act 1974, Construction (Design & Management) Regulations 2015 and other relevant guidance.
Hoarding construction needs to last for as long as the construction is taking place on a particular site. However, whilst the length of time will depend on the individual project circumstances, the standard acceptable lifespan of site hoarding is 10 years.
The cost of a project will depend on the type of hoarding you require and the duration of your project. All Plasloc products are competitively priced, and we work closely with you to provide the best quotation and price for your hoarding construction requirements. Get in touch today for a free quote with no obligations.
All sections of Plasloc hoarding are connected with a traditional tongue and groove joint and compression lock which removes the need for any fixings such as nails and screws and reduces any cutting and drilling to limit potential damage. It also requires no ground penetration, so it can easily be installed at the start of the project and removed at the end of it, to suit all your hoarding construction needs.
Plasloc has successfully completed numerous high-profile, ambitious projects due to the consistent strength of our products' ability to adapt and the professional team of operatives to implement effective delivery.
In a world oversaturated with digital marketing and social media, it's easy to overlook the tried-and-true methods of advertising that...
Plasloc Demo Wall System: The Ultimate Wall Partitioning Solution In the fast-paced world of construction and infrastructure development, a reliable...
Whenever construction is taking place in retail or commercial, measures must be taken to keep those who may come into...
Do you require the best hoarding solution for your hoarding construction project? We’re here to help support you from start to finish, whether it is large or small, we will find the best hoarding construction solution for you.
Get a quote