Our office will be closed on 20th Dec- 6th Jan 2025. We wish all our customers a Merry Christmas and a Happy New Year
Plasloc Temporary Pedestrian Access Tunnels are bespoke to your requirements. We utilise a system scaffold to produce a safe and secure temporary structure which we then clad with our patented Plasloc boards. Alternatively, if you require a fully fire-rated system we can utilise composite panels giving up to 2 hours of fire integrity. Our access tunnels are ideal for both internal and external use, whether you need a covered walkway for an office reception to remain open while demolition works commence. Or an external facade in a retail environment? Perhaps you need a covered pedestrian linking tunnel between two adjacent buildings in a hospital setting? Whatever you need, give us a call and we will find a workable solution.
Our Tunnels give a pristine white surface which is ideal for advertising, aesthetic graphics, or just leave them original as a hygienic wipe down surface. We can also ensure your tunnel is equipped with lighting, doors or even windows.
Bespoke width and height
Fire integrity and insulation up to 2 hours
Acoustic properties
Insulation properties with a defined U value
Lighting
Doors
Windows
Weather proofing
Full Temporary Works and engineers design
Hygienic wipe down surfaces – ideal in food and medical environments
Plasloc’s core ideology is to create sustainable hired products. With over 8 million tonnes of plastic waste entering our oceans every year, we believe it is fundamental to get full use of our product's life span. When our boards do come to the end of their life, we responsibly recycle them by having them ground up and returned to the plastic industry as raw material to be either extruded back into more Plasloc boards or another uPVC product. Our recycled Plasloc patented boards are used to create temporary hoarding solutions such as office partitioning and construction hoarding, all in an effort to contribute to being an eco-friendly driven business and have a meaningful impact across the country.
Got a question for us? Hopefully we can answer it in our Frequently Asked Questions here:
Get a quoteTo comply with the Health and Safety at Work Act 1974, all employers and the self-employed must take reasonable steps to ensure the safety of the general public. The implication of this is that construction sites need a protective boundary, with site hoarding being the most fitting solution. This has led to a demand for hoarding construction systems .
The principal contractor has responsibility for construction site hoarding. However, whether they wish to design the hoarding construction themselves or employ a subcontractor to do it for them is their choice.
Before any construction work starts. In most cases within the construction industry, this is essential to protect site workers and comply with the Health and Safety at Work Act 1974, Construction (Design & Management) Regulations 2015 and other relevant guidance.
Hoarding construction needs to last for as long as the construction is taking place on a particular site. However, whilst the length of time will depend on the individual project circumstances, the standard acceptable lifespan of site hoarding is 10 years.
The cost of a project will depend on the type of hoarding you require and the duration of your project. All Plasloc products are competitively priced, and we work closely with you to provide the best quotation and price for your hoarding construction requirements. Get in touch today for a free quote with no obligations.
All sections of Plasloc hoarding are connected with a traditional tongue and groove joint and compression lock which removes the need for any fixings such as nails and screws and reduces any cutting and drilling to limit potential damage. It also requires no ground penetration, so it can easily be installed at the start of the project and removed at the end of it, to suit all your hoarding construction needs.
Plasloc has successfully completed numerous high-profile, ambitious projects due to the consistent strength of our products' ability to adapt and the professional team of operatives to implement effective delivery.
In a world oversaturated with digital marketing and social media, it's easy to overlook the tried-and-true methods of advertising that...
Plasloc Demo Wall System: The Ultimate Wall Partitioning Solution In the fast-paced world of construction and infrastructure development, a reliable...
Whenever construction is taking place in retail or commercial, measures must be taken to keep those who may come into...
Do you require the best hoarding solution for your hoarding construction project? We’re here to help support you from start to finish, whether it is large or small, we will find the best hoarding construction solution for you.
Get a quote